header banner
SOCIETY

Out of 11 micro hydro- power projects in Parbat, 8 no longer in operation

PHALEBAS ( Parbat), Dec 3: Many of micro hydro-power projects based in rural parts of Parabat, eight are not in operation.
alt=
By Republica

PHALEBAS ( Parbat), Dec 3: Many of micro hydro-power projects based in rural parts of Parabat, eight are not in operation. 



Out of 11 micro- hydropower projects developed by the joint venture of the United Nations Development Programme, World Bank and the Nepal Government around one and half decades ago, eight have been completely closed.The trend of closing the locally-operated micro hydro-power projects began with the supply of electricity to the villages from the national grid. 


Related story

Unseasonable flooding stalls power generation plunging two vill...


The 12-KW Aghuwakhola Micro Hydro Power Project based in the south Parbat, the 7.5-KW Gadhisiddha at Pangrang, the 11-KW Bachchhakhola, the 12-KW Gedikhola at Huwas, the 16-KW Dhuwakot at Bhorle VDC and the 16-KW Ghattekhola based in Kyang VDC have been completely closed. 


Only the 27-KW Thadokhola Project based in Bhuktang VDC, the 6 KW- Chhaharekhola at Bhoksing and the 9 KW- Charchharekhola Project are operational, according to District Development Committee Energy Section Chief Manju Shilakar. Consumers are not interested in resuming the closed power projects though power produced at local level is cheaper than that supplied from the national grid, she said. Efforts are going on to revive the closed projects, it is learnt. RSS 


 

https://devmyrepublica.nagariknewscdn.com/shared/web/uploads/media/5b4b8b82b9b3d.jpg
Related Stories
ECONOMY

Govt collects Rs 3.15 billion in royalty from hydr...

Govt collects Rs 3.15 billion in royalty from hydro projects
ECONOMY

Power generation from 90 micro hydropower projects...

Power generation from 90 micro hydropower projects smooth after maintenance
ECONOMY

Modi-Laha Chowk transmission line comes into opera...

Modi-Laha Chowk transmission line comes into operation
ECONOMY

Flood-damaged Lower Modi-1 hydel project resumes p...

Flood-damaged Lower Modi-1 hydel project resumes power production
SOCIETY

Cabinet endorses revised  targets on combating Cli...

Cabinet endorses revised  targets on combating Climate Change

Trending

Top Videos

Bold Preety willing to fight for her musical career

Awareness among people on heart diseases has improved in Nepal’

Print still remains the numbers of one platform

Bringing home a gold medal is on my bucket

What is Nepal's roadmap to sage child rights